Tag Archives: ESNG

ESNG meeting – 21 February 2018

We were missing both the Cha(I)rman on another anti-social milk round, and Mr Atfield dodging the rain (I think) in Cyprus.  But with a number of visitors we had 12 people there and plenty of trains running.  It was also … Continue reading

Posted in ESNG, ESNG meetings, Out and about | Tagged , , , , | 3 Comments

On my workbench #7

Delivery of a 450mm wide ‘half’ hollow door has provided a home for my new N-club modules – and indeed any other small layout in the future.  After investing in a stud-wall detector, three large brackets support the door as … Continue reading

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | 2 Comments

On my workbench #6

Some more progress with buildings for the first module. These two half-relief row houses are Walther’s kits.  The left hand one was salvaged from Earl’s Wood.  The right hand one is new, but the kit has been ‘in stock’ since … Continue reading

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment

ESNG turns 21 – the evidence?

East Surrey N Gauge is 21 this year, and we thought this auspicious date should be marked in some way.  So this week Derek delivered a large cardboard box to me…. The contents were a 100 off for a Dapol … Continue reading

Posted in ESNG, ESNG meetings, Out and about | Tagged , , , , | 1 Comment

Linx

I’d hoped to report more workbench progress today, but work has been delayed by the timber yard losing my order, and my plastic filler going solid (well, it probably was 10 years old.)  So a couple of links from Model … Continue reading

Posted in Hints and tips, Layout design, N Club International, Out and about | Tagged , , , | 1 Comment

ESNG meeting – 1 February 2018

A busy evening with a round dozen members attending (some more round than others.)Unfortunately we were still missing the Cha(I)rman’s tea making expertise.  But the usual suspects were soon filling the fiddleyard. Derek brought along his Kato Kowloon Canton Railway … Continue reading

Posted in ESNG, ESNG meetings, Out and about | Tagged , , , , | Leave a comment

On my workbench #5

More gentle progress – the first two buildings for the modules.  One a Walther’s plastic kit, the other a wood craftsman kit of an ice house.  The photograph is, of course, cruel!  A little touching up of the ice house … Continue reading

Posted in ESNG, Jon's layout ramblings, On my workbench | Tagged , , | Leave a comment